江心洲型船闸通航安全问题及改善措施研究On the navigation safety and amelioration measures of the island-type shiplocks
胡旭跃;许晓琳;沈小雄;黄伦超;
摘要(Abstract):
船闸布置在江心洲上后,由于相邻建筑物的动水作用及两汊水流在洲尾的交汇,将会影响船闸的通航安全。为研究江心洲型船闸下游的船舶航行问题,探讨有效的改善措施,结合澧水艳洲枢纽、沅水桃源枢纽布置的共同特点,在物理模型基础上利用船舶模型试验分析船闸下游影响航行安全的因素,研究采取针对性措施后航行条件的改善效果。结果表明:布置隔流堤、导流墩等辅助建筑物只能解决下游靠近引航道出口部分航段的通航问题;综合采用拓宽航槽、优化航线、合理调度、优化船闸布置等措施,可有效减小船体漂移,优化航行环境,保障船舶通航安全。
关键词(KeyWords): 安全工程;水路运输;船闸布置;江心洲;通航安全;船舶模型试验
基金项目(Foundation): 国家自然科学基金项目(51079009);; 西部交通科技项目(20113280001570)
作者(Authors): 胡旭跃;许晓琳;沈小雄;黄伦超;
参考文献(References):
- [1]Institute of Water Transportation Plan Design in China(中交水运规划设计院).JTS 182-1—2009 Design code for hydro-junction general layout of canalization works(渠化工程枢纽总体设计规范)[S].Beijing:China Communication Press,2009.
- [2]QIU Jianwu(邱建吾).Plan layout optimization of Zhuzhou navigation power junction[J].Port&Waterway Engineering(水运工程),2002(7):88-90.
- [3]WU Peng(吴澎),ZHANG Shan(张珊),LUO Shaozhen(罗少桢),et al.Site selection and layout of navigation-power junction[J].Port&Waterway Engineering(水运工程),2011(9):185-188.
- [4]CHEN Canhui(陈灿辉),LI Yiping(李一平).Discussion on the layout of the lock in the barrage project[J].Guangdong Hydropower Technology(广东水电科技),1994(4):13-16.
- [5]Changsha University of Science and Technology(长沙理工大学).Ship model experimental research on navigation conditions of Taoyuan hydropower station(桃源水电站船闸通航条件船模试验研究)[R].Changsha:School of Hydraulic Engineering,Changsha University of Science and Technology,2010.
- [6]Changsha University of Science and Technology(长沙理工大学).Model experimental research on lock reconstruction project of Yanzhou hydro-junction(艳洲枢纽船闸改造工程模型试验研究)[R].Changsha:School of Hydraulic Engineering,Changsha University of Science and Technology,2012.
- [7]HU Xuyue(胡旭跃),LI Biao(李彪),XU Lijun(徐立君).A review of research on navigation flow condition of hydro-junction[J].Port&Waterway Engineering(水运工程),2005(11):65-70.
- [8]XU Guobing(徐国兵).Layout plan of Zhuzhou navigation-power junction[J].Port&Waterway Engineering(水运工程),2008(6):108-111.
- [9]LI Juntao(李君涛),HAO Pinzheng(郝品正),LI Jinhe(李金合).Optimization research on plan layout of Yuliang hydro-junction project of Youjiang River[J].Journal of Waterway&Harbor(水道港口),2007,28(5):348-352.
- [10]YU Guangnian(于广年),WANG Yi’an(王义安),ZHANG Rihong(章日红).Study on plane layout of Yilan navigation power junction in Songhua River[J].Water Resources&Hydropower of Northeast(东北水利水电),2011(6):1-3.
- [11]WEI Jing(魏晶),SONG Gencai(宋根才),JIANG Feng(蒋峰).Analysis of shiplock arrangement and navigation flow condition at Yujiang Laokou hinge[J].Western China Communications Science&Technology(西部交通科技),2012(8):144-146,152.
- [12]YUE Wenjie(岳文杰),LIU Da(刘达).Experiment research on the buildings optimized layout at the shipment gate for Qingyuan water conservancy hub project[J].Journal of Guangdong Technical College of Water Resources and Electric Engineering(广东水利电力职业技术学院学报),2009,7(3):37-41.
- [13]WANG Luobin(王罗斌),SHI Jiaohao(石教豪),PAN Hualan(潘化兰),et al.Hydraulic model test of Tingzikou hydrology project research[J].Yangtze River(人民长江),2009,40(20):20-23.
- [14]GONG Yanqing(龚延庆),WANG Yi’an(王义安),LI Jinhe(李金合).Measures for improving navigable flow condition of Dadingzishan hinge[J].Journal of Waterway and Harbour(水道港口),2004,25(2):90-92.
- [15]HAN Changhai(韩昌海),YU Zhiguang(余之光),YANG Yu(杨宇).Plan arrangement optimization of navigation structures of the Xiaoxitan junction[J].Port&Waterway Engineering(水运工程),2013(6):99-102.
- [16]LI Jinhe(李金合),ZHENG Baoyou(郑宝友),ZHOU Huaxing(周华兴).Study on flow condition for the left bank lock of Naji shipping-junction[J].Journal of Waterway and Harbour(水道港口),2002,23(4):262-267.
- [17]ZHANG Yali(张亚利).Gezhouba Dam route design and review[J].Yangtze River(人民长江),2002,33(2):14-18.
- [18]WU Xueru(吴雪茹).Research on navigation flow condition of hydro-junction[J].Port&Waterway Engineering(水运工程),2006(9):52-55.
- [19]GE Longzai(戈龙仔),LIU Honghua(刘红华),MENG Xiangwei(孟祥玮).Influence of daily regulation of the Three-gorge power station on navigation flow conditions during flood period and its improving measures[J].Journal of Waterway and Harbour(水道港口),2004,25(4):204-208.