摘要(Abstract):
科学、合理地预测桥梁桩基工后沉降量是高速铁路建设的关键环节。鉴于京沪高速铁路桥梁桩基沉降曲线在多级荷载作用下呈明显阶梯形基本特征,而常规沉降预测模型不能反映全过程的沉降与时间的关系,引入荷载系数的概念,建立了变形过程指数模型,介绍了模型的求解过程及参数的确定方法。并结合沉降实测资料,运用指数曲线模型和Logistic模型进行对比分析。结果表明,变形过程指数模型能将架梁前期的观测数据纳入分析时间段内,其预测精度高,误差小,预测结果与实测数据基本吻合。进一步对模型参数的计算值进行粗差分析及归类,给出了不同地基土层、不同荷载作用下参数β的建议值。
关键词(KeyWords): 安全工程;沉降预测;变形过程指数模型;高速铁路;桥梁桩基
基金项目(Foundation): 铁道部京沪高速铁路科技重大专项(2008G31-B)
作者(Authors): 胡中波;马建林;苏春晖;周俊;
参考文献(References):
- [1]YANG Hualong(杨华龙),LIU Jinxia(刘金霞),ZHENG Bin(郑斌).Improvement and application of grey prediction GM(1,1)model[J].Mathematics in Practice and Theory(数学的实践与认识),2011,41(23):39-46.
- [2]WANG Zhiliang(王志亮),HUANG Jingzhong(黄景忠),LI Yongchi(李永池).Study on application of Asaoka's method to settlement prediction[J].Rock and Soil Mechanics(岩土力学),2006,27(11):2025-2032.
- [3]ZHU Zhiduo(朱志铎),ZHOU Lihong(周礼红).Application of Logistic model in settlement prediction during complete process of embankment construction[J].Chinese Journal of Geotechnical Engineering(岩土工程学报),2009,31(6):965-969.
- [4]YU Chuang(余闯),LIU Songyu(刘松玉).Study on prediction of embankment settlement with the gompertz model[J].Rock and Soil Mechanics(岩土力学),2005,26(1):82-86.
- [5]WU Qixing(吴起星),HU Hui(胡辉).Law analysis of soft settlement treated by vacuum preloading based on Gompertz growth curve[J].Chinese Journal of Rock Mechanics and Engineering(岩石力学与工程学报),2006,25(S):3600-3606.
- [6]XIAO Zhiyu(肖治宇),CHEN Changfu(陈昌富).Settlement prediction of soft clay roadbed based on Richards model[J].Journal of Highway and Transportation Research an Development(公路交通科技),2008,25(11):29-32.
- [7]CHEN Shanxiong(陈善雄),WANG Xingyun(王星运),XU Xichang(许锡昌),et al.Three-point modified exponential curve method for prediction subgrade settlements[J].Rock and Soil Mechanics(岩土力学),2011,32(11):3355-3360.
- [8]PAN Linyou(潘林有),XIE Xinyu(谢新宇).Observational settlement prediction by curve fitting methods[J].Rock and Soil Mechanics(岩土力学),2004,25(7):1053-1058.
- [9]CHEN Shanxiong(陈善雄),WANG Xingyun(王星运),XU Xichang(许锡昌),et al.New method for forecasting subgrade settlement of railway passenger dedicated line[J].Rock and Soil Mechanics(岩土力学),2010,31(2):478-482,488.
- [10]LENG Wuming(冷伍明),YANG Qi(杨奇),NIE Rusong(聂如松),et al.Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation[J].Rock and Soil Mechanics(岩土力学),2011,32(11):3341-3348.
- [11]L¨U Wentian(律文田),WANG Yonghe(王永和),LENG Wuming(冷伍明),et al.Analysis of in-situ static and dynamic load tests for precast static pressure pile[J].Rock and Soil Mechanics(岩土力学),2005,26(2):251-255.
- [12]Ministry of Railways of the People's Republic of China(中华人民共和国铁道部).[2006]158 The qualification evaluation technical guide for laying ballastless track in passenger dedicated railway line(客运专线铁路无碴轨道铺设条件评估技术指南)[S].Beijing:China Railway Publishing House,2006.
- [13]ZENG Guoxi(曾国熙),YANG Xiling(杨锡令).Analysis of sand wells foundation subsidence[J].Journal of Zhejiang University(浙江大学学报),1959(3):34-72.
- [14]LU Tinghao(卢廷浩).Soil mechanics(土力学)[M].Nanjing:Hohai University Press,2005.
- [15]QIN Shanglin(秦尚林),CHEN Shanxiong(陈善雄),XU Xichang(许锡昌).Extending exponential curve model for prediction of subgrade settlement[J].Railway Standard Design(铁道标准设计),2010,10(2):28-30.
- [16]YANG Maoxing(杨茂兴).The coarse error eliminating in small sample space[J].Metrology and Measurement Technique(计量与测试技术),2005,32(1):27-28.